Weight: 2020 tonnes
Water depth: 18 m (59 ft)
Tanker Size: 110,000 dwt
Contract awarded: Oct, 2011
Year of delivery: April, 2013
Scope of Work:
CDO is responsible for the construction and procurement of a Tower Yoke Mooring System for the FPSO which is deployed in the field in Bohai Bay and is a replacement for a previously operating mooring system.
The Tower Yoke Mooring System is an interface between the wells and the FPSO and will provide for the transfer of well fluids, water injection and provide Medium Voltage power to the well head platforms.
This Tower Yoke Mooring System is DNV classed.